Kings Contractors provides controlled demolition, site-clearance and enabling works for commercial, public-sector and private clients throughout Surrey, West Sussex and the surrounding areas.
We undertake the removal of unwanted structures, surfaces and external features, leaving sites clear, safe and ready for redevelopment or improvement. With our own excavators, breakers, grabs and dumpers, we can complete demolition works efficiently across both open sites and areas with restricted access.
We carry out carefully planned demolition works on a range of structures and external features.
Our services include:
Demolition of garages, sheds and outbuildings
Removal of walls and retaining structures
Breaking out concrete bases and foundations
Removal of patios, paths and hardstanding
Removal of fencing, gates and external structures
Dismantling timber and steel structures
Partial demolition and alteration works
Preparation for extensions and new construction
Each project is assessed individually so that the safest and most suitable method of demolition can be agreed before work begins.
Using specialist machinery and attachments, we can break out reinforced and unreinforced concrete, tarmac, paving and other existing surfaces.
Once the material has been removed, we can excavate and prepare the area for new foundations, drainage, surfacing or landscaping. Where suitable, materials can be separated for recycling or reuse as part of the wider project.
Our site-clearance services prepare land and buildings for the next stage of construction or improvement.
This can include:
Vegetation and overgrowth clearance
Removal of redundant structures
Excavation of old foundations
Clearance of unwanted materials
Ground levelling and preparation
Formation of safe working areas and access routes
Preparation for new services and drainage
We can coordinate the clearance and preparation as one package, helping the following construction works begin without unnecessary delay.
Safety is central to every demolition project. Our works are planned around the structure, surrounding properties, existing services, access restrictions and the ongoing use of the site.
Any known or suspected asbestos must be identified through the appropriate surveys before demolition begins and removed by a suitably qualified specialist where required.
Waste materials are separated where practical and removed using appropriate disposal and recycling routes, helping to keep the site organised throughout the works.
Kings Contractors can take a project beyond the demolition stage. Once the area has been cleared, our team can complete the required groundworks, foundations, drainage, surfacing, landscaping, fencing and final reinstatement.
This coordinated approach provides clients with one point of contact from the initial clearance through to the completed external works.
Contact Kings Contractors to discuss your demolition or site-clearance requirements, arrange a site visit or request a quotation.